Industrial
-
The establishment is a dairy product processing plant that includes processing machinery, storage bulk product and chemicals, loading and unloading areas, as well as office spaces, and locker facilities for employees.
-
The current facility was expanded to include a new addition featuring a high-density storage warehouse, loading bays, and an administrative office spaces. The new section will be linked to the existing facility along the western portion of the southern exterior wall.
-
A two-storey office facility featuring a total of four vehicle bays designed for pull-through access.
-
The existing fruit processing facility underwent an expansion that involved the construction of a cold storage and shipping area. Alongside the expansion, a series of minor interior upgrades and improvements were implemented within the facility. These improvements aimed to increase the efficiency and ensure superior quality and handling of the fruits.
-
Manufacturing facility dedicated to the production of alcoholic beverages.
-
The existing building is a single-storey facility, that accommodates both industrial and retail tenant areas. The Badlands craft distillery established its operations within this building.
-
A newly constructed industrial building, supporting offices, an industrial repair bay.
-
Existing facility redeveloped into a two-storey self-storage building, encompassing an area of approximately 2,500 square meters.
-
A newly built barley cleaning facility will replace the current cleaning plant located atop the existing concrete silos.